Case Study | 21 Feb 2022
St Aloysius Sixth Form College, London
Built OffSite recently completed a £2.5 million new build three storey sixth form college building for St Aloysius College in Highgate, London, using PERFORMANCE windows from 21°.
PERFORMANCE triple glazed FSC timber windows were selected to help to help the project meet BREEAM Excellent requirements. 21° supplied over 60 casement windows for the project, which was built off site, using modern construction methods.
The PERFORMANCE windows not only provided an aesthetically pleasing edge to the building but also helped with the overall heat loss of the building due to their low U values; on a BREEAM project that proved a great help. We were really pleased with the service and support from 21°.
Charles Pierce from Built Off-Site
Project details
Completed
2013